TY - JOUR AU - Marpaung, Richad AU - Susanti, Elva PY - 2022/12/03 Y2 - 2024/03/29 TI - ANALISIS PENGENDALIAN PERSEDIAAN BAHAN BAKU DALAM MEMINIMASI BIAYA PRODUKSI DI PT VOLEX BATAM JF - Computer and Science Industrial Engineering (COMASIE) JA - comasiejournal VL - 7 IS - 7 SE - Articles DO - UR - https://ejournal.upbatam.ac.id/index.php/comasiejournal/article/view/6039 SP - 116-126 AB - <p>Policy in determining the level of control of raw material inventory that must be maintained, <br />by placing orders to increase inventory to be made and how large orders must be held. <br />Cable raw material inventory data for several months, such as in March 2021 the company <br />experienced an excess of 3,000 pcs of raw materials, in April 2021 there was a shortage <br />of raw materials of 500 pcs, and the biggest shortage occurred in December 2021, which <br />was 4,000 pcs. occurs due to erratic demand from customers so that companies often <br />experience shortages and excess raw materials, sometimes shortages of raw materials <br />for delivery occur from suppliers who arrive late. The method used in this research is the <br />method of Economic Order Quantity (EOQ) and Silver Meal. The results of calculations <br />using the Economic Order Quantity (EOQ) inventory model, obtained the number of orders <br />for one order of cable raw materials is 39,200 pcs. Then for the safety stock of cable raw <br />materials outside the routine needs of cable raw materials as many as 23 pcs. The results <br />of the calculation of the time for reordering raw materials are 1,640 pcs. The total cost that <br />must be incurred by the company if using the Economic Order Quantity (EOQ) inventory <br />model is Rp. 11,091,666, - and using the Silver Meal method the company incurs a cost <br />of Rp. 8,241,666, - for cable raw materials.</p> ER -