USULAN PERANCANGAN TATA LETAK LANTAI PRODUKSI DENGAN METODE SLP DAN BLOCPLAN PADA PRODUK CUTTING STEEL PIPE DI CV. ABC DI CILEUNGSI

Perancangan Tata Letak Fasilitas

Authors

  • Silmi Saffanah Sadjugo Universitas Jenderal Soedirman
  • Rani Aulia Imran Universitas Jenderal Soedirman
  • Ayu Anggraeni Sibarani Universitas Jenderal Soedirman

DOI:

https://doi.org/10.33884/jrsi.v8i2.6625

Keywords:

facility layout, machine, BLOCPLAN, SLP, cutting steel pipe

Abstract

Facility layout is a procedure for establishing factory facilities to support the smooth running of a production process. CV. ABC is an automotive manufacturing industry that produces cutting steel pipe products, part of motorcycle spare parts. This study aims to design a new facility layout for the production of cutting steel pipe products to minimize the distance of material movement and the moment of movement, as well as the company's desire to increase production targets by adjusting machine requirements. In designing the layout of this proposed facility using the BLOCPLAN algorithm software. Based on the calculation of machine requirements the measurement process lacks 1 person, the cutting process in the automatic machine section lacks 2 machines, while for the Manual machine section lacks 1 machine. The Manual cutting process, there is a shortage of 1 machine. A quality control and packing on automatic machines require 1 person and 3 people. Meanwhile, packing in the Manual machine section requires as many as 2 people. Material transfer distance between departments is calculated using the rectilinear method. The moment of material movement is calculated by multiplying the displacement distance by the frequency. The total distance of material movement in the existing layout results in 148.2 meters with a displacement moment of 18981.3 meters per month. Meanwhile, the redesign using the BLOCPLAN algorithm software resulted in a total material transfer distance of 110.88 meters with a displacement moment of 15621.21 meters per month.

References

Ambarwati, R., & Supardi. (2020). Buku Ajar Manajemen Operasional dan Implementasi Dalam Industri. In H. C. Wahyuni & W. Sulistyowati (Eds.), Buku Ajar Manajemen Operasional Dan Implementasi Dalam Industri. UMSIDA Press. https://doi.org/10.21070/2020/978-623-6833-48-3

Apple, J. M. (1990). Tata Letak Pabrik dan Pemindahan Bahan (I. Z. Sutalaksana (ed.); Ketiga). Institut Teknologi Bandung.

Arif, M. (2017). Perancangan Tata Letak Pabrik (Pertama). Deepublish.

Badan Pusat Statistik. (2021). Direktori Industri Manufaktur 2021 (Direktorat Statistik Industri (ed.)). Badan Pusat Statistik.

Bhawsar, V., & Yadav, A. (2016). Improving productivity by the application of systematic layout plan and work study. International Journal of Latest Trends in Engineering and Technology, 6(4), 117–124.

Dalimunthe, Z. A., Tambunan, M. M., & Tarigan, U. (2017). Perancangan Ulang Tata Letak Fasilitas Produksi dengan Menerapkan Algoritma BLOCPLAN, CORELAP, dan ALDEP di PT Kharisma Cakranusa Rubbery Industry. Universitas Sumatera Utara.

Gómez, J., Tascón, A., & Ayuga, F. (2018). Systematic layout planning of wineries: The case of Rioja region (Spain). Journal of Agricultural Engineering, 49(1), 34–41. https://doi.org/10.4081/jae.2018.778

Heragu, S. S. (2016). Facilities Design (4th ed.). CRC Press, Taylor & Francis.

Husen, T. A., Suryadhini, P. P., & Astuti, M. D. (2020). Perancangan tata letak fasilitas untuk meminimasi jarak material handling pada UKM XYZ menggunakan metode ALDEP. Prosiding IDEC 2020, November, A08.1-A08.12.

Ivanov, D., Tsipoulanidis, A., & Schönberger, J. (2019). Global Supply Chain and Operation Management : A Decision-Oriented Introdustion to th Creation of Value (2nd ed.). Springer.

Kadim, A. (2017). Penerapan Manajemen Produksi dan Operasi Di Industri Manufaktur. In N. Sunardi & A. Sutarman (Eds.), Jakarta: Mitra Wacana Media (Pertama). Mitra Wacana Media.

Karakaya, E., & Eldemir, F. (2019). Air Cargo Facility Layout Planning and Meta-Heuristic Solution Approach. 149–161. https://doi.org/10.1007/978-3-030-03317-0_13

Muther, R., & Hales, L. (2015). Systematic Layout Planning Pattern. In Management & Industrial Research Publications. http://hpcinc.com/wp-content/uploads/2016/07/Systematic-Layout-Planning-SLP-4th-edition-soft-copy.pdf

Ningtyas, A. N., Choiri, M., & Azlia, W. (2015). Perancangan Ulang Tata Letak Fasilitas Produksi Dengan Metode Grafik Dan Craft Untuk Minimasi Ongkos Material Handling. Jurnal Rekayasa Dan Manajemen Sistem Industri, 3(3), 495–504.

Pérez-Gosende, P., Mula, J., & Díaz-Madroñero, M. (2021). Facility layout planning. An extended literature review. International Journal of Production Research, 59(12), 3777–3816. https://doi.org/10.1080/00207543.2021.1897176

Purnomo, H. (2004). Perencanaan dan Perancangan Fasilitas (Pertama). Graha Ilmu.

Ramadhan, M., Hasudungan, A., & Ramandha, D. (2021). Perancangan Computerized Layout Dengan Menggunakan software BlocPlan ( Studi Kasus : PT . XYZ ). 4(1). https://doi.org/10.32734/ee.v4i1.1296

Russell, R. S., & Taylor III, B. W. (2011). Operations Management : Creating Value Along the Supply Chain (seventh). John Wiley & Sons, Inc.

Sule, D. R. (2008). Manufacturing Facilities : Location, Planning, and Design (Third). CRC Press, Taylor & Francis.

Sutari, O., & U, S. R. (2014). Development of Plant Layout Using Systematic Layout Planning (SLP) To Maximize Production – A Case Study. 8, 1–4.

Tompkins, J. A., White, J. A., Bozer, Y. A., & Tanchoco, J. M. A. (2010). Facilities Planning (J. Welter (ed.); Fourth). John Wiley & Sons, Inc.

Triagus Setiyawan, D., Hadlirotul Qudsiyyah, D., & Asmaul Mustaniroh, S. (2017). Improvement of Production Facility Layout of Fried Soybean using BLOCPLAN and CORELAP Method (A Case Study in UKM MMM Gading Kulon, Malang). Industria: Jurnal Teknologi Dan Manajemen Agroindustri, 6(1), 51–60. https://doi.org/10.21776/ub.industria.2017.006.01.7

Wignjosoebroto, S. (2009). Tata Letak Pabrik dan Pemindahan Bahan (I. K. Gunarta (ed.); Ketiga). Guna Widya.

Published

2023-06-22

Issue

Section

Articles