PERENCANAAN PENJADWALAN PRODUKSI UNTUK MEMINIMALISIR KETERLAMBATAN PEMESANAN PADA PT XYZ

Authors

  • Dia Ardiana Pitaloka Universitas 17 Agustus 1945 Surabaya
  • Wiwin Widiasih Universitas 17 Agustus 1945 Surabaya

DOI:

https://doi.org/10.33884/jrsi.v9i2.8801

Keywords:

Scheduling, Makespan, Cost.

Abstract

PT XYZ is a company operating in the furniture sector which produces tables, chairs and cupboards. This company's ordering system is make to order, both export and local. The production process at this company consists of 7 production process flows including the CPP process, wood process, assembly, sanding, painting, checking, packing. The production process takes place using 20 different types of machines. The problem faced by the company is delays in fulfilling orders that do not comply with the deadline provisions. This problem is caused by inefficient production scheduling, therefore researchers analyze production scheduling using the Campbell Dudeck Smith, Palmer and Dannenbring methods and analyze the costs. However, before scheduling machines, it is necessary to test data uniformity, adequacy, normal time and standard time. The aim of these three methods is to find the minimum makespan value. From the results of these calculations, the minimum Makespan value obtained from the CDS and Dannenbring methods is 813.33 hours in the order GFABCED, GFACBED, GFACEBD, GFBCAED, GFCABED, GFCBAED. If you use the company's calculation method, the makespan value is 1026 hours with details of 840 working hours and 186 overtime hours. The CDS and Dannenbring methods in the order GFABCED, GFACBED, GFACEBD, GFBCAED, GFCABED, GFCBAED require labor costs of Rp. 141,520,058, whereas if you use the company method the labor costs are Rp. 150,253,734 required. If compared, the savings cost is IDR 8,733,676 per worker.

References

Andi Muh.Fadel Fachryansyah, Jhon, Dr. Vladimir, V. F. (2021). Analisis Penjadwalan Menggunakan Metode Algoritma Nawaz Enscroe Ham, Algoritma Campbell Dudek Smith dan Metode Dannenbring Untuk Meminimasi Makespan. Gastronomía Ecuatoriana y Turismo Local., 1(69), 5–24.

ANTARI, N. K. D. P., HARINI, L. P. I., & TASTRAWATI, N. K. T. (2021). Analisis Penjadwalan Produksi Menggunakan Metode Campbell Dudek Smith Dan Dannenbring Dalam Meminimumkan Total Waktu Produksi Beras. E-Jurnal Matematika, 10(4), 215.

Arifandi, D., Lasalewo, T., & Hasanuddin, H. (2023). Penjadwalan Produksi Untuk Meminimalkan Makespan Menggunakan Metode Cds Dan Heuristik Palmer Di Rumah Industri Wahyu. Industri Inovatif : Jurnal Teknik Industri, 13(1), 52–60.

Febrilliandika, B. (2020). Anwar Efendi Nasution 2) 1) Jurusan Teknik Industri, Fakultas Teknik. Jl. Dr Mansyur, 9, 1–7.

Irsyad, M., & Oktiarso, T. (2020). Penjadwalan Produksi Dengan Algoritma Dannenbring dan Branch and Bound pada Produksi Atap Galvalum Di PT NS Bluescope Lysaght Indonesia. Journal of Integrated System, 3(2), 148–160.

Nurdiansyah, Y. A., & Satoto, H. F. (2023). Optimasi Waktu Standar Kerja Menggunakan Metode Stopwatch Time Study. JURMATIS (Jurnal Manajemen Teknologi Dan Teknik Industri), 5(1), 59.

Rahayu, M., & Juhara, S. (2020). Pengukuran Waktu Baku Perakitan Pena Dengan Menggunakan Waktu Jam Henti Saat Praktikum Analisa Perancangan Kerja. Unistek, 7(2), 93–97.

Septian, M., & Herwanto, D. (2022). Penentuan target produksi paint roller berdasarkan perhitungan waktu baku menggunakan metode stopwatch time study. Journal Industrial Servicess, 7(2), 206.

Widiasih, W., & Aziza, N. (2019). Dengan Mempertimbangkan Penjadwalan. 14(02), 68–76.

Yudisha, N. (2021). Perhitungan waktu baku menggunakan metode Jam Henti pada proses Bottling. Jurnal VORTEKS, 2(2), 85–90.

Published

2024-05-31

Issue

Section

Articles