ANALISIS PREVENTIVE MAINTENANCE MESIN INJECTION MOLDING DI PT YEAKIN PLASTIC INDUSTRY BATAM
Keywords:
Injection molding, MTTR, Preventive maintenance, RCMAbstract
PT Yeakin Plastic Industry is a company engaged in manufacturing plastic goods. The problem that occurs in this study is the high downtime that occurs on the injection molding machine. So that the amount of production does not reach the target. The purpose of this study is to determine the interval of preventive maintenance injection molding to minimize machine downtime. The method used in this research is Reliability Centered Maintenance (RCM). From the results of the study, it was found that the results of the weibull distribution obtained the maintenance interval of the A200 injection molding machine with the longest downtime, where there were 11 breakdowns in 6 months, and maintenance actions were carried out at the maintenance interval for 100.55 hours. On the A201 injection molding machine there are 8 breakdowns in 6 months, and maintenance actions are carried out at maintenance intervals for 144.44 hours. On the A202 injection molding machine there were 8 breakdowns in 6 months, and maintenance actions were taken at the maintenance interval for 122.97 hours.
References
Abdul, W. A., Muhamad, A., Solahhudin, & Desy, A. (2023). Analisis Preventive Maintenance pada Mesin Injection Molding dengan Metode Mean Time Between Failure dan Mean Time to Repair di PT. XZY. Jurnal Serambi Engineering, 9(1), 7623–7630. https://doi.org/10.32672/jse.v9i1.720
Firmansyah, M. A., & Syuhri, A. (2022). Analisis Perencanaan Perawatan Spindle Moulder Dengan Metode Reliability Centered Maintenance (Rcm) Di Pt. Romi Violeta. Rotor, 15(1), 17. https://doi.org/10.19184/rotor.v15i1.29360
Nababan, R. M., & Tarigan, E. P. L. (2023). Analisis penjadwalan sistem perawatan mesin molding pada pt kwong fai di kota batam.
Nurroif, A., & Retnowati, D. (2022). Perencanaan Preventive Maintenance Mesin Crane Dengan Pendekatan Metode Reliability Centered Maintenance (RCM). Jurnal Teknik Industri, 1(2), 111. https://doi.org/10.30659/jurti.1.2.111-119
Pasaribu, F. L., & Fajrah, N. (2020). Analisis Efektifitas Mesin Injection Moulding Pada PT Nittoh Batam.
Syafei, M. I., & Suhendar, E. (2022). Analisis Perawatan Mesin dengan Pendekatan Metode Reliability Centered Maintenance (RCM) dan Maintenance Value Stream Map (MVSM) (Studi Kasus di PT. Nusa Indah Jaya Utama). Integrasi : Jurnal Ilmiah Teknik Industri, 7(2), 67. https://doi.org/10.32502/js.v7i2.4783
Wahyuridho, D. R., & Asep, E. N. (2022). Analisis Perawatan Mesin dengan Menggunakan Metode Reability Centered Maintenance dan Fuzzy Fuzzy Failure Mode and Effect Analysis. Jurnal Indonesia Sosial Teknologi, 3(08), 867–878. https://doi.org/10.36418/jist.v3i8.474
Widyaningrum, M. R., & Winati, F. D. (2022). Penjadwalan Perawatan Mesin di CV Wijaya Workshop dengan Pendekatan Reliability Centered Maintenance (RCM). Jurnal TRINISTIK: Jurnal Teknik Industri, Bisnis Digital, Dan Teknik Logistik, 1(1), 37–43. https://doi.org/10.20895/trinistik.v1i1.455