Analisis Nilai Overall Equipment Effectiveness Pada Mesin Wheeloader Liugong CLG-856

Authors

  • Suparmanto Suparmanto Universitas Putera Batam
  • Adi Nugroho Universitas Putera Batam

Keywords:

Availability ratio, Performance efficiency, Rate of Quality, OEE

Abstract

Work measurement system is very important for the company, it aims to know whether or not achieved the target company. The use of the tool can only be repaired and controlled properly if the right performance measurement system is used, to know the value of a machine or equipment effectiveness it is necessary to use a method of Overall Equipment Effectiveness (OEE), to obtain the OEE value required calculation 3 (three) Availability Ratio, Performance effeciency, Rate ofQuality. The research was conducted on the Wheel Loader CLG-856 engine. The data used in this study consisted of data for one year. OEE calculation results from January 2016 - December 2016. The average value of Availability wheel loader no 16 from january 2016-december 2016 is 87.10%, Value Performance efficiency wheel loader no 16 from January 2016-December 2016 is above the value Ideal> 95%, Rate of Quality wheel loader no 16 from January 2016 - December 2016 is above ideal value> 99%, and OEE indicates that it is still below ideal value> 85%, where the average value of OEE is 84 , 73%, and the value is categorized acceptable
but needs to be over 85% improvement and move towardswordclass.

References

Alamsyah, F. (2015). Analisis Akar Penyebab Masalah dalam Meningkatkan Overall EquipmentEffectiveness (OEE) Mesin Stripping Hipack III dan Unimac di PT PFI. Jurnal OE, VII(Unversitas Esa Tungal), 289–302.

Anastasya, D., & Purwanggono, B. (2016). Perhitungan dan Analisis Nilai Overall Equipment Effectiveness (OEE) Pada Line Pouch PT. XYZ. Program Studi Teknik Industri, (Universitas Diponegoro), 1–5.

Arifianty, M. S., & Rumita, R. (2016). Perhitungan Dan Analisis Nilai Overall Equipment Effectivity ( OEE ) Pada Cylinder Head Line Pt . Toyota Motor Manufacturing Indonesia Jakarta, (Universitas Diponegoro), 1–7.

Asgara, B. Y., & Hartono, G. (2014). Analisis Efektifitas Mesin Overhead Crane dengan Metode Overall Equipment Effectiveness (OEE) di PT. BTU, divisi Boarding Brigde. Industrial Engineering Department, 15(Binus University), 62–70.

De Ron,AJ and Rooda,JE.(2005). OEE and Equipment Effectiveness : an Evaluation. International Journal of Production Research.

Jhonsson P, Leshamar.(1999). Evaluation and Measurement of Manufacturing Performance Measurement System-the Role of OEE. international Journal of Operation and Production Management.

Katalog Alat Berat Konstruksi, (2013:40). Lawrence Mann Jr.(1998) Measurement of Overall Equipment Effectivenese as a Basic for TPM Activities. International Journal of Operation & Production Management.

Osama, T.(2010).Total Productive Maintenance Review and Overall Equipment Effectiveness Measurment. Jordan Journal of Mechanical and industrial Engineering.

Purnama, B. Z. (2015). Analisis Nilai Overall Equipment Effectiveness (OEE)

sebagai Langkah Peningkatan Efektivitas Mesin Pellet Mill di PT. Ni Cibitung. Jurnal OE, VII(2), 228–237

Downloads

Published

2020-05-11

How to Cite

Suparmanto, S., & Nugroho, A. (2020). Analisis Nilai Overall Equipment Effectiveness Pada Mesin Wheeloader Liugong CLG-856. Prosiding Seminar Nasional Ilmu Sosial Dan Teknologi (SNISTEK), 2, 177–187. Retrieved from https://ejournal.upbatam.ac.id/index.php/prosiding/article/view/6431

Issue

Section

Articles