Fluctuations in market demand for broiler chickens pose a challenge for broiler processing companies in balancing demand with production capacity. PT X often faces problems with actual capacity mismatch with production schedules, potentially causing delays or stock shortages. This study aims to optimize broiler production capacity at PT X through the implementation of Master Production Schedule (MPS) and Rough Cut Capacity Planning (RCCP). The research method used is a quantitative approach by collecting and analyzing data on production, demand, inventory, and safety stock levels. The MPS is prepared to determine the amount of production needed in a certain period based on projected demand and inventory conditions. Furthermore, RCCP is applied as an evaluation stage to assess the suitability of available production capacity with MPS needs. From the preparation of the MPS scheduled weekly, the results obtained were 221,944 kg / week, then from the analysis with RCCP through the Bill of Labor approach, it was found that several work centers showed a capacity shortage compared to MPS needs, especially at work center I which uses a drum chiller machine. The recommended improvement proposal is to add 1-2 hours of overtime per shift to close the production capacity gap. The research results show that the implementation of MPS can provide a more structured overview of the production schedule, while RCCP plays a crucial role in ensuring existing production capacity can meet demand needs. Thus, the combination of MPS and RCCP supports company decision-making and optimizes production capacity planning at PT X.

References

Alhikmah, P., Budiharti, N., & Galuh, J. H. (2024). Perencanaan kapasitas produksi alen alen menggunakan metode Rough Cut Capacity Planning (RCCP) (studi kasus UMKM Pak Miran). Jurnal Valtech, 7(1), 179-192.

Cahya, D. (2016). Analisis kebutuhan kapasitas produksi pupuk Phonska menggunakan metode Rough Cut Capacity Planning (RCCP) (studi kasus di PT. Petrokimia Gresik). Doctoral dissertation. Universitas Brawijaya.

Fahmi, A. N. (2020). Penentuan alternatif perencanaan kapasitas produksi untuk memenuhi permintaan pelanggan (studi kasus UMKM Vendora di Minomartani, Yogyakarta). Doctoral dissertation. UPN Veteran, Yogyakarta.

Hadinata, R., Salmia, L. A., & Priyasmanu, T. (2021). Perencanaan kapasitas produksi menggunakan metode Rough Cut Capacity Planning (RCCP) pada home industri Loca Nusa. Jurnal Valtech, 4(1), 21-28.

Hasibuan, R. P. (2017). Perencanaan kapasitas produksi Crude Palm Oil menggunakan metode Rough Cut Capacity Planning (RCCP) di PT London Sumatera Indonesia Tbk Turangie Palm Oil Mill.

Lestari, R. I., Buwarda, S., & Natsir, A. D. S. R. (2024). Perencanaan kapasitas produksi menggunakan metode Rough Cut Capacity Planning pada home industry Roti NK. Jurnal Serambi Engineering, 9(3), 9529-9540.

Megawati, & Pramudena, S. M. (2021). Penerapan capacity planning melalui pemindahan mesin dan investasi Mold dengan metode Net Present Value (NPV) pada PJTS. Jurnal Indikator, 5(3), 102-118.

Setiabudi, Y., Afma, V. M., & Irwan, H. (2018). Perencanaan kapasitas produksi ATV12 dengan menggunakan metode Rough Cut Capacity Planning (RCCP) untuk mengetahui titik optimasi produksi (studi kasus di PT Schneider Electric Manufacturing Batam). PROFISIENSI: Jurnal Program Studi Teknik Industri, 6(2), 80-87.

Susditianto, V. L., Nursanti, E., & Priyasmanu, T. (2024). Analisis penjadwalan produksi Polypropylene menggunakan metode Aggregate Planning. Jurnal Valtech, 7(2), 405-411.