Abstract

UMKM Kembang Goyang is one of the UMKM located in the Jatinegara area, East Jakarta. This UMKM has a flagship product in the form of kembang goyang cake. The high demand for kembang goyang cake orders, especially before Eid al-Fitr (Lebaran), with only 2 workers, makes this UMKM overwhelmed in fulfilling its production, resulting in this UMKM losing orders up to 100 packs. This study aims to calculate the processing time of each work station, standard output and the optimal number of workers needed. The method used in this study is a stopwatch time study. The stopwatch time study method is a direct measurement to obtain actual time or cycle time by considering the operator's work tempo and allowance, so that standard work time is obtained. The results show that kembang goyang cake produced from 1 kg of flour can produce 228 cakes. The standard time for kneading is 30 minutes per dough container. The standard heating time is 28 minutes per 2 liters of cooking oil. The standard time for frying until the dough is finished is 3 hours. Safety stock and defective products are set at 8 cakes, so there are 220 cakes ready to be packed at the packaging station. The standard time for packing 220 cakes into 10 packages is 30 minutes. The total time needed to make kembang goyang cakes from 1 kg of flour is 4 hours and 15 minutes. The number of workers needed at each work station is 1 person, but because this work is continuous, 1 person can work continuously from the kneading station, heating the oil, frying to packaging. If the order before Lebaran reaches 100 packages, then the number of workers needed is 10 people at each work station.

References

Anugrahati, N. A., & Sari, C. D. P. (2023). Penentuan Formulasi Kembang Goyang Hasil Substitusi Tepung Beras Merah Organik Berdasarkan KLadar Serat pangan dan Tekstur. Amerta Nutrition, 7(4), 512–519.

Astuti, A. W., Retnaningsih, S. M., & Prastuti, M. (2022). Analisis Pengukuran Waktu Kerja di UMKM Ikhwan Mbois Lamongan. Jurnal Sains Dan Seni ITS, 11(1). https://doi.org/10.12962/j23373520.v11i1.63232

Muti, A. A., Sari, T. N., & Ahmad, N. H. (2022). STOPWATCH TIME STUDY (STUDI KASUS CEMILAN SBR). Jurnal Rekayasa Sistem Industri, 8(1), 36–40.

Prayudha, S. B. (2020). ANALISIS PENGUKURAN KERJA DALAM MENENTUKAN WAKTU BAKU UNTUK MENINGKATKAN PRODUKTIVITAS KERJA PADA PRODUKSI KERUDUNG MENGGUNAKAN METODE TIME STUDY PADA UKM LISNA COLLECTION DI TASIKMALAYA (Vol. 1, Issue 1).

Rosalina, E., Hananto, A. L., Hananto, A., & Huda, B. (2024). Analisis dan Pemodelan Proses Bisnis Katering pada UMKM Menggunakan BPMN. INTERNAL (Information System Journal, 7(1), 8–17. https://doi.org/10.32627

Sekarningsih, P. E., & Hadining, A. F. (2022). Analisis Pengukuran Kerja Dalam Menentukan Waktu Baku Pada Operator Mesin Broaching Dengan Metode Pengukuran Waktu Jam Henti (Studi Kasus: PT XYZ). In Jurnal Teknik Industri (Vol. 8, Issue 2).

Septian, M., & Herwanto, D. (2022). Penentuan target produksi paint roller berdasarkan perhitungan waktu baku menggunakan metode stopwatch time study. Journal Industrial Servicess, 7(2), 206. https://doi.org/10.36055/jiss.v7i2.12756

Tangkudung, A. G., Sompie, P. L., & Mahdi, U. (2024). Strategi dan Inovasi Model Bisnis Katering dalam Meningkatkan Daya Saing di Era Pasar Digital.

Yenny, M., Rini, N. A., & Latipah, N. (2019). PEMANFAATAN TEPUNG UBI UNGU SEBAGAI SUBSTITUSI TEPUNG BERAS UNTUK PEMBUATAN KUE KEMBANG GOYANG. In Jurnal Sains Terapan Pariwisata (Vol. 4, Issue 2).

Yudha Pradana, A., & Pulansari, F. (2021). ANALISIS PENGUKURAN WAKTU KERJA DENGAN STOPWATCH TIME STUDY UNTUK MENINGKATKAN TARGET PRODUKSI DI PT. XYZ. In Juminten : Jurnal Manajemen Industri dan Teknologi (Vol. 02, Issue 01).

Published

2025-11-30