Abstrak

Machinery or production equipment is one of the assets owned by a company that
requires effective maintenance in order for the company to continue to be productive.
Problem encountered is found the machine / production equipment that can not operate
properly, causing the engine breakdown is increasing. One step that can be taken by the company to be able to determine the level of effectiveness of machinery and equipment production by measuring the level of Overall Equipment Effectiveness (OEE). The purpose of this study is to evaluate the effectiveness of pre-turning process in maintenance activities to improve productivity of PT APCB, to identify causes of non-optimal maintenance activities at PT APCB, and to propose improvements for maintenance effectiveness at PT APCB. One approach that can be applied by PT APCB is by applying Total Productive Maintenance (TPM). Based on the calculation results, obtained the average OEE value in 2016 was 67,45%. The lowest OEE value in the Pre-Turning process in 2016 was in February at 48.31%, while for the highest OEE in September was 83.23%. This is caused by the bar feeder problem with the highest request frequency value so that the low effectiveness of the Pre-turning process is indicated by the low value of OEE. Proposed improvement for maintenance effectiveness at PT APCB is to apply TPM better by always controlling the level of OEE.

Referensi

Almeanazel,O.T.R. (2010). Total Productive Maintenance Review and Overall

Equipment. Jordan Journal of Mechanical and Industrial Engineering, 4(4), 517–522.

Ashokkumaar. (2011). Implementation of Overall Equipment Effectiveness (OEE). International Journal F Engineering Trends and Technology (IJETT), 2(3), 14–27.

Badiger, A. S., & Gandhinathan, R. (2008). A proposal: evaluation of OEE and

impact of six big losses on equipment earning capacity. International Journal of Process Management and Benchmarking.

Hamdhani, F., & Hamsi, A. (2014). Optimasi Pemesinan Pada Mesin Bubut Tipe M-300. Jurnal E-Dinamis, 8(Maret), 184–193.

Hassani, L., & Hashemzadeh, G. (2015). The impact of overall equipment effectiveness on production losses in Moghan Cable & Wire manufacturing. International Journal

for Quality Research, 9(4), 565–576.

Kamath, N. H., & Rodrigues, L. L. R. (2016). Simultaneous consideration of TQM

and TPM influence on production performance: A case study on multicolor offset machine using SD Model. Perspectives in Science, 8, 16–18.

Livia, K., & Fewidarto, P. D. (2016). Evaluasi Peningkatan Kinerja Produksi melalui Penerapan Total Productive Maintenance di PT Xacti Indonesia dituntut untuk

meningkatkan kemampuannya dalam memproduksi produk yang, VII(1), 32–47.

Mwanza, B. G., & Mbohwa, C. (2015). Design of a Total Productive Maintenance Model for Effective Implementation: Case Study of a Chemical Manufacturing Company. Procedia Manufacturing, 4(Industrial Engineering and Service Science, IESS), 461–470.

Rahayu, A. (2014). Evaluasi Efektivitas Mesin Kiln Dengan Penerapan Total Productive Maintenance Pada Pabrik II/III PT Semen Padang. Jurnal Optimasi Sistem Industri, 13(1), 454–485.

##submission.downloads##

Diterbitkan

2021-02-15

Cara Mengutip

Noviardi, N., & Fajrah, N. . (2021). Evaluasi Efektifitas Proses Pre-Turning Dengan Penerapan Total Productive Maintenance Pada PT Apcb. Prosiding, 3, 229–239. Diambil dari https://ejournal.upbatam.ac.id/index.php/prosiding/article/view/6439

Terbitan

Bagian

Articles