ANALISIS EFEKTIVITAS MESIN CNC PLATE CUTTING PADA PT. SUMBARTEC JAYA LIEVINDO
DOI:
https://doi.org/10.33884/comasiejournal.v10i3.9070Keywords:
Machine Effectiveness, Maintenance, OEE, Six Big Losses, TPMAbstract
PT.Sumbartec jaya lievindo located in Batam, Indonesia, is a leading company in the manufacturing and technology sector. The problem that occurs in this study is that manual and automatic (CNC) cutting machines cause several defects in the plate, such as non-diagonal cutting and uneven edges, which result in defective products and interfere with the effectiveness of the production process. The purpose of this study is to measure machine performance using the OEE (overall equipment effectiveness) approach so that recommendations can be given to improve machine effectiveness by applying causal analysis (fishbone). The method used in this research is Overall Equipment Effectiveness (OEE) as a tool to measure overall equipment performance. Based on the results of the study, it is found that the average availability value is 83%, for the average performance value, the value is 87%, while the average rate of quality product is 93%, and the average value (OEE) is 67% Thus, the average OEE value is still below the World OEE Class standard which is worth 85%. The types of six big losses that dominantly cause low OEE values on cnc plate cutting machines are reduced speed losses and equipment failure losses have the same value as Idling & minor stoppages. Idling & minor stoppages 17% is the biggest losses of all losses that occur and equipment failure losses are in second place with a value of 16.%.
References
Ariyah Jurusan Teknik Industri, H., Sains dan Teknologi, F., Sultan Syarif Kasim Riau Jl Soebrantas No, U. H., & Baru, S. (2022). Penerapan Metode Overall Equipment Effectiveness (OEE) Dalam Peningkatan Efisiensi Mesin Batching Plant (Studi Kasus: PT. Lutvindo Wijaya Perkasa). Jurnal Teknologi Dan Manajemen Industri Terapan (JTMIT), 1, 70–77.
Dafa Ashari, D., Naubnome, V., Fauji, N., Karawang, S., HSRonggo Waluyo, J., Karawang, K., & Barat, J. (2022a). ANALISIS KINERJA MESIN AMG CNC PLATE CUTTING MENGGUNAKAN METODE OEE (OVERALL EQUIPMENT EFFECTIVENESS). 15(2).
Dwi Saputra, A., Suroso, H. C., Adhi, I. T., & Surabaya, T. (2022). Analisis Efektivitas Mesin Menggunakan Metode Overall Equipment Effectiveness (OEE) Untuk Mengurangi Six Big Losses Serta Upaya Perbaikan Dengan Kaizen Di PT. PG Candi Baru Sidoarjo. Seminar Nasional Sains Dan Teknologi Terapan X, 1–8.
Gianfranco, J., Taufik, M. I., Hariadi, F., & Fauzi, M. (2022a). PENGUKURAN TOTAL PRODUCTIVE MAINTENANCE (TPM) MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA MESIN REAKTOR PRODUKSI. 3(1). https://doi.org/10.46306/lb.v3i1
Gusniar, I. N., & Sidik, A. (2022). ANALISIS TPM MESIN PEMOTONG TEKSTIL OTOMATIS CNC-CUTTER KURIS DENGAN METODE OEE DI PT. YIFAN JAYA. Rang Teknik Journal, 5(1), 56–60. https://doi.org/10.31869/rtj.v5i1.2733
Hairiyah, N., Rizki Amalia, R., & Rino Adi Wijaya, dan. (n.d.). ANALISIS TOTAL PRODUCTIVE MAINTENANCE (TPM) PADA STASIUN KERNEL CRUSHING PLANT (KCP) DI PT. X.
Hapid Maksum, A., & Taufiq Rachmat, M. (2023a). Analisis Efektivitas Mesin Shearing menggunakan Metode Overall Equipment Effectiveness pada PT. Anugrah Damai Mandiri. VIII (2).
Hutabarat, M. M., & Muhsin, A. (2020a). Analisis Tingkat Efektivitas Kerja pada Mesin Auto Hanger dengan Menggunakan Metode Overall Equipment Effectiveness (OEE). Opsi, 13(1), 56. https://doi.org/10.31315/opsi.v13i1.3468
Musyafa’ah, M., & Sofiana, A. (2022a). Analysis of Total Productive Maintenance (TPM) Application Using Overall Equipment Effectiveness (OEE) and Six Big Losses on Disamatic Machine PT. XYZ. OPSI, 15(1), 56. https://doi.org/10.31315/opsi.v15i1.6630
Primula, G., & Hamdy, M. I. (2023). Evaluasi Efektivitas Mesin Ripple Mill Melalui Pendekatan Overall Equipment Effectiveness (OEE). Jurnal Teknologi Dan Manajemen Industri Terapan (JTMIT), 2(4), 301–309.