ANALISIS BEBAN KERJA FISIK DALAM PENENTUAN WAKTU ISTIRAHAT PADA KARYAWAN WELDER PADA PT MCDERMOT INDONESIA

Authors

  • Fernando Dominggus Awola universitas putera batam
  • Sri Zetli

DOI:

https://doi.org/10.33884/comasiejournal.v12i3.9798

Keywords:

cvl, employee performance, job fatigue, physiological workload

Abstract

This study aims to analyze the physical workload and determine the optimal rest time for welders at PT McDermott Indonesia using a physiological approach. Workload was measured through the Cardiovascular Load (CVL) method and energy consumption based on heart rates during work. The results showed that %CVL ranged from 30%–59%, categorized as "needs improvement." Most workers had energy consumption <5 Kcal/min, but three workers exceeded this threshold: two morning shift level-2 welders (Putra 5.07 Kcal/min; Hotmianto 5.05 Kcal/min) and one night shift level-4 welder (Deo 5.25 Kcal/min). These workers required additional rest times of 11.8 minutes, 8.5 minutes, and 38.7 minutes, respectively. Meanwhile, the standard 30-minute rest period was sufficient for others.

References

Alfonso, I. E., Widodo, L., & Sukania, I. W. (2022). Analisa Beban Kerja Fisik Dan Mental Untuk Menentukan Jumlah Pekerja Optimal Di Pt X. Jurnal Mitra Teknik Industri, 1(1). https://doi.org/10.24912/jmti.v1i1.18269

Hafizh, M. A., & Prabowo, R. (2023). Implementasi Lean Six Sigma untuk Meminimasi Waste Proses Produksi Obat Nyamuk Bakar. 9(1), 1–12.

Marom, K., Ngizudin, R., & Novasani, R. J. (2023). Pendekatan NBM dan RULA Dalam Mengukur Postur Kerja Juru Las. Journal of Industrial Engineering Tridinanti, 1(2), 24–28. http://jietri.univ-tridinanti.ac.id

Nurdin, A. M., Rusindiyanto, R., & Saifudin, J. A. (2020). Analisis Faktor Lingkungan Kerja Fisik Dan Penentuan Waktu Istirahat Kerja Di Pt. Xyz. Juminten, 1(6), 37–48. https://doi.org/10.33005/juminten.v1i6.179

Syapujagat, A. B. R., & Mundari, S. (2023). Analisis Beban Kerja Untuk Menentukan Jumlah Tenaga Kerja (Studi Kasus UD. Bangkit Bersama). 2(45), 33–45.

Hudaningsih, N., Adiasa, I., & Rizky, I. (2023). Analisis Beban Kerja Pada Pekerja Bagian Welder Di Pt. Rezza Usaha Mandiri Menggunakan Metode Cardiovascular Dan Full Time Equivalen. Jurnal Industri & Teknologi Samawa, 4(1), 8–14.

Lady, L., & Wiyanto, A. S. (2019). Tingkat Kelelahan Kerja Pada Pekerja Luar Ruangan Dan Pengaruh Lingkungan Fisik Terhadap Peningkatan Kelelahan. Journal Industrial Servicess, 5(1), 58–64.

Narpati, J. R., Ekawati, E., & Wahyuni, I. (2019). Hubungan Beban Kerja Fisik, Frekuensi Olahraga, Lama Tidur, Waktu Istirahat dan Waktu Kerja dengan Kelelahan Kerja. Jurnal Kesehatan Masyarakat, 7(1), 337–344.

Novasani, R. J., & Ngizudin, R. (2022). Pengukuran Beban Kerja Pada Pegawai Kampus Menggunakan Cardiovascular Load Dan NASA-TLX. Jurnal Teknik Industri: Jurnal Hasil Penelitian Dan Karya Ilmiah Dalam Bidang Teknik Industri, 8(2), 150. https://doi.org/10.24014/jti.v8i2.19870

Downloads

Published

2025-02-05

How to Cite

Dominggus Awola, F., & Zetli, S. (2025). ANALISIS BEBAN KERJA FISIK DALAM PENENTUAN WAKTU ISTIRAHAT PADA KARYAWAN WELDER PADA PT MCDERMOT INDONESIA. Computer and Science Industrial Engineering (COMASIE), 12(3), 49–57. https://doi.org/10.33884/comasiejournal.v12i3.9798