PERANCANGAN ULANG LAYOUT PROSES PRODUKSI PADA PT SUNNINGDALE TECH

Authors

  • Elita Lidya Universitas Putera Batam
  • Anggia Arista

Keywords:

Activity Relationship Chart, Algoritma Craft, From-To Chart, Material Handling

Abstract

PT ABC is an industrial company that produces precision plastics such as tools, medical devices, and workshop tools. This company works on products, especially product design, injection molding, printing, and assembly. The current state of the layout production process at PT ABC is still not well structured because not taken into account the degree of closeness between work departments. This can lead to wastage of material handling costs due to long distances and alternating flows, so it is necessary to redesign the layout of the new facility in order to rearrange the material flow path to suit the product flow. To improve the layout of the production process facilities, this research uses the From to Chart, Activity Relationship Chart (ARC) and Craft (Computerized Relative Allocation of Facilities Techniques) algorithms which can produce a production facility layout design and minimize the total cost of material handling and manage traffic. design cross-production materials to run smoothly. The results of the initial layout research cost Rp. 10,520,856 per month while the new layout costs Rp. 7,858,312 per month. From these results, it was found a reduction in material handling costs of 2,662,544/month or more effectively around 25.32% from the initial facility layout.

Downloads

Published

2021-07-27

How to Cite

Lidya, E., & Arista, A. (2021). PERANCANGAN ULANG LAYOUT PROSES PRODUKSI PADA PT SUNNINGDALE TECH. Computer and Science Industrial Engineering (COMASIE), 5(7), 70–80. Retrieved from https://ejournal.upbatam.ac.id/index.php/comasiejournal/article/view/4422

Issue

Section

Articles