PERENCANAAN DAN PENGENDALIAN KETERSEDIAAN SPARE PART MOBIL DI BENGKEL JOSUA

Penulis

  • van becham nainggolan van becham nainggolan Universitas Putera Batam
  • Welly Sugianto Universitas Putera Batam

DOI:

https://doi.org/10.33884/comasiejournal.v11i4.9190

Kata Kunci:

Car spare parts, Economic Order Quantity (EOQ), Inventory Management

Abstrak

This study aims to plan and control the inventory of car spare parts at Josua Auto Repair Shop in Tanjung Piayu, Batam City, addressing issues like frequent out-of-stock items, hazardous mechanic positions, disorganized layout, and inadequate tools. The Economic Order Quantity (EOQ) method is used to forecast sales and determine optimal ordering frequency and costs for key spare parts such as engine oil, oil filters, brake pads, brake fluid, and spark plugs. Results show that for engine oil, the sales forecast from May 2023 to April 2024 is 1000 pcs with a purchasing frequency of 13 times per year and an optimal order of 75 pcs per purchase, with storage costs of IDR 153,000 and ordering costs of IDR 431,000. Oil filters are projected to sell 1000 pcs with a frequency of 16 times per year and an optimal order of 61 pcs, with storage costs of IDR 111,000 and ordering costs of IDR 205,000. Brake pads, brake fluid, and spark plugs are similarly analyzed. This study provides guidance for Josua Auto Repair Shop in effectively managing inventory, reducing stock shortages, and improving customer service.

Referensi

Atta Luthfi Nurul Falah, Khoirul Arief, & Radhinal Sa’id Riginianto. (2023). Analisis Pengendalian Kualitas Pada Tempe Menggunakan Metode Seven Tools Dan FMEA. Jurnal Teknologi Dan Manajemen Industri Terapan, 2(3). https://doi.org/10.55826/tmit.v2i3.264

Fitriyani, E., & Siahaan, M. (2020). Analisis Pengendalian Persediaan Bahan Baku dengan Menggunakan Metode EOQ pada PT Sigma Indonesia MFG. JUDICIOUS, 1(2). https://doi.org/10.37010/jdc.v1i2.141

Kusuma Ningrat, N., & Gunawan, S. (2023). Pengendalian Persediaan Bahan Baku Untuk Meningkatkan Efisiensi Biaya Persediaan Dengan Menggunakan Metode Eoq ( Economic Order Quantity ) Di Umkm Kerupuk Nusa Sari Kecamatan Cimaragas Kabupaten Ciamis. Jurnal Industrial Galuh, 5(1). https://doi.org/10.25157/jig.v5i1.3058

Mahendra, R. I., Sitania, F. D., & Wahyuda, W. (2023). Analisis Pengendalian Persediaan Dengan Menggunakan Metode Economic Order Quantity. Jurnal Teknik Industri: Jurnal Hasil Penelitian Dan Karya Ilmiah Dalam Bidang Teknik Industri, 9(2). https://doi.org/10.24014/jti.v9i2.22677

Melizsa, M., Kasumawati, F., & Nuryamin, E. (2021). Analisis Pengendalian Persediaan Obat Bpjs Dengan Metode Analisis ABC, Metode Economic Order Quantity (EOQ), Dan Reorder Point (ROP). Edu Masda Journal, 5(1). https://doi.org/10.52118/edumasda.v5i1.118

Wardani, E. A., Yekti A, R. P., Ardhi Pratama, F. E., & Retnowati, N. (2023). Analisis Pengendalian Persediaan Bahan Baku dengan Menggunakan Metode EOQ (Studi Kasus pada UMKM Jessica Bakery Banyuwangi). Jurnal Ilmiah Inovasi, 23(3). https://doi.org/10.25047/jii.v23i3.3985

##submission.downloads##

Diterbitkan

2025-01-13

Cara Mengutip

Nainggolan, V. B., & Welly Sugianto. (2025). PERENCANAAN DAN PENGENDALIAN KETERSEDIAAN SPARE PART MOBIL DI BENGKEL JOSUA. Computer Science and Industrial Engineering, 11(4), 85–95. https://doi.org/10.33884/comasiejournal.v11i4.9190